Wuhan virus: China mobilises medical teams to fight new coronavirus
Tel: +86-25-8461 0201
Website: www.hiclover.com
Email: [email protected]
Email: [email protected]
medical waste incinerator solutions and prices for 100 bed / 500 bed / 1000 bed / 3000 bed hospitals. – Assumption: general hospital beds 50%, operation beds 50% for the 100 bed hospital case, while this ratio is 30-70% for the other cases – international standards and waste creations assumptions should apply INCINERATOR, DIESEL. CAPACITY…
[ecwid widgets=”productbrowser search categories” default_category_id=”CATEGORY_ID” default_product_id=”PRODUCT_ID” lang=”EN”]
HS Code for waste incinerator 84178050 Item Specification Model TS100 PLC Main Product List per 01 set Primary Combustion Chamber Secondary Combustion Chamber Smoke Filter Chamber Incinerator PLC Control Case Chimney:10.0Meters *(upgrade to Stainless Steel, free cost) Italy oil/gas burner: 02 units Oil Tank (if oil fuel): 200Liters …
incinerator manufacturer,medical incinerator,small scale incinerator,oil fired incinerator Items/Model TS100 Burn Rate Average 100 kg/hour Feed Capacity Average 200 kg/feed Control Mode PLC Combustion Chamber 1200L Internal Dimensions 120x100x100cm Secondary Chamber 600L Smoke Filter Chamber Yes Feed Mode Manual Voltage 220V Power 0.7Kw Oil Consumption (kg/hour) 14–28 Gas Consumption (m3/hour) 10–32.2 Temperature Monitor Yes Temperature Protection…
Model TS30 oil fired waste small incinerator 30kgs/hr. Items/Model TS30(PLC) Picture Burn Rate Average 20-30 kg/hour Feed Capacity Average 60kg per feeding Control Mode PLC(Programmable Logic Controller Incinerator) Combustion Chamber 330L Internal Dimensions 75x75x60cm Secondary Chamber 180L Smoke Filter Chamber Yes Feed Mode Manual Feeding Voltage 220V Power 0.5Kw Oil Consumption (kg/hour) Average 13.3…
1.The double chamber incinerator shall preferably be designed. Air supply in the primary and secondary chamber shall be regulated between 30%-80% and 170%-120% of stoichiometric amount respectively. Flow meter/suitable flow measurement device shall be provided on the primary and secondary air ducting. The combustion air shall be supplied through a separate forced draft fan accounting…